Image 1 of 1

101008_Gas Rig.jpg

A gas well being drilled. The rig will remain until the drilling is finished, usually around a week. After this trucks move in for another week, to force millions of gallons of water and carcinogenic chemicals into the whole, causing mini earthquakes and releasing gas.
Copyright
Spike Johnson
Image Size
3833x2546 / 1.8MB
Contained in galleries
Practice Lays Waste To Land
A gas well being drilled. The rig will remain until the drilling is finished, usually around a week. After this trucks move in for another week, to force millions of gallons of water and carcinogenic chemicals into the whole, causing mini earthquakes and releasing gas.